Reconstruction and modernization of coal belt conveying system

The aim of the reconstruction and modernization was to increase the liability of coal handling incl. the precaution of risks of fire and coal ash explosion which are based on valid legislation NV 406/2004 Coll., as well as a provision of controlled automatic sampling of both delivered and used fuel and metal separation..

In total, the reconstruction included 6 belt conveyors (lengths from 40 to 220 m, belt width 1000 mm).

The following equipment and works were the subjects of reconstruction:

  • complete dismantling of conveyors
  • complete coating of conveyor steel structures
  • replacement of damaged roller seats and rollers
  • delivery of new rubber belts, new wipers
  • delivery of impact cradles and chutes
  • delivery of new drives, new drive and reverse drums
  • delivery of new hardox chutes
  • dismantling of existing metal separators and delivery of 2 new separators + metal indicators and markers
  • dismantling of an existing sampler and delivery of a new automatic sampler with sampling from the lines A, B
  • delivery of misting technology at chutes of conveyors T6/T7 and T7/T8 of lines A, B